Case StudyNovember 23rd, 2021
Eclipse® Solid Points on a 35 Cubic Yard Bucket
Eclipse® Solid Points on a 35 Cubic Yard Bucket
Product
Eclipse® Solid Points (PPS9BHPSA & PLPS9HB locking system)
Platform
Dragline 35 cubic yard bucket lip assembly
Situation
A coal company, operating a surface strip mine located in South Central Alberta, Canada found they were experiencing performance problems with GET on their two 35 cubic yard buckets. The buckets were fitted with two lip assemblies using old technology resulting in under performing GET. They found they were needing to change out their existing points every 4-8 days, resulting in considerable downtime for maintenance.
Bradken was selected to refurbish the lip assemblies in order to improve bucket performance and extend service life.
Solution
The Bradken fabrication shop located in Edmonton completed refurbishment of the two dragline bucket lip assemblies and provided a new
GET solution consisting of Bradken’s Eclipse® Solid Points (PPS9BHPSA), combined with a PLPS9HB mechanical lock system to better suit the digging conditions.
Results
Bradken Eclipse® Solid points resulted in a longer service life with an average of 298,700 BCM per set of points.
The average life span of Bradken’s Eclipse® Solid points was 14-20 days, depending on digging conditions. This was a dramatic improvement compared to the previous competitor's points that lasted only 4-8 days on average.
In addition, the
GET change-out time has been reduced after using the Bradken PLPS9HB mechanical lock system.
Over a year a total of 150 hours downtime was saved in using the Bradken
GET when compared to the competitor
GET system.